Friday, March 6, 2009

Beautiful weather, beautiful progress!

Things are moving along very nicely.  Bates Electric was back yesterday pulling all the wires through and attaching the switches.  They have 2 more days of work to complete.  Ameren still hasn't put the meter in.  They have been promising to do it for the last few days.
The cabinets look so nice.  They have all been installed, a few doors still need to be put on along with the handles.  Kevin, Jim and Gordon were at the house until 11 on Wednesday putting them on.  The bottom doors had to be on before the countertop template could be made.  The soapstone counters will be installed next week.
Here is the desk area.  
The island.  The butcher block top is perfect!
Our front door.

Master bedroom door.  